Commit Graph

3 Commits

Author SHA1 Message Date
Luke Tornquist
c0ab789499 feat(buzz-db): retire the channel-TTL trigger (#8210)
## Summary

This drops the channel-TTL event trigger. The application already
refreshes ephemeral-channel deadlines in the event transaction
(`event_follow_up::refresh_channel_ttls`, from #8135), so the trigger
only repeats that work.

This PR originally retired both follow-up triggers. #8352 has since
retired the push-match trigger in migration 0063, so after the rebase
this PR covers only the TTL half.

Migration `0065_retire_channel_ttl_trigger.sql`:
- `SET LOCAL lock_timeout = '5s'` (the same bound as 0063)
- drops `events_refresh_channel_ttl` and
`refresh_channel_ttl_after_event_insert()`

Dropping the trigger on the partitioned parent also drops its partition
clones. Published migrations, including 0022 and 0024, stay
checksum-frozen.

The same objects are removed from `schema/` (`schema/functions/…`,
`schema/triggers/events.sql`, `schema/schema.sql`) and from the pgschema
reconcile script. After this, migrated and desired-state databases have
no event follow-up triggers.

Tests:
- `follow_up_retirement_tests.rs` (renamed from
`push_retirement_tests.rs`): the push-retirement upgrade test now stops
at 0063. A new test upgrades 0064 → 0065 and checks that the TTL trigger
is gone from the parent and every partition, that the function is gone,
and that the published checksums haven't changed.
- `event_follow_up_postgres_tests.rs`: the contract now has two arms.
`AppOnly` is the shipped schema, where both triggers are absent. `Dual`
reconstructs the historical overlap of both triggers. The `PushRetired`
arm (the push trigger dropped, the TTL trigger kept) was the shipped
state before this PR. Its tests are removed because `Dual` and `AppOnly`
together cover it.
- `embedded_migrator_contains_consolidated_initial_schema` pins the 0065
statements and checks that both objects are absent from the desired
schema.

**Deploy gate:** do not run 0065 against a database still served by a
relay older than #8135. After 0065, raw SQL writers no longer refresh
TTL deadlines. `docs/push-gateway-deployment.md` is updated to match.

### What got simpler

The trigger and the app no longer both refresh TTL deadlines; the app is
now the only producer. One plpgsql function and one trigger are gone
from both schema paths, and 8 per-partition drops are gone from the
reconcile script. The follow-up contract drops from three arms to two.

### Related issue

BUZZ-313 (Linear), part of the trigger-retirement work.

### Testing

Head is `4f7d0baf0`. Results below are at `678927730` unless noted.
`678927730..4f7d0baf0` changes only one test in
`crates/buzz-db/src/store/event.rs`, described in the first bullet.

- **Fixed test,
`permanent_channel_event_commits_do_not_lock_the_channel_row`**
(`4f7d0baf0`).
- **Why it changed:** after 0065, its raw-pool inserts no longer ran any
TTL refresh, so the test passed whatever `refresh_channel_ttls` did.
This was raised in review.
- **What it does now:** it inserts through the production `AdmittedTx`
path and keeps the barrier and the tuple-lock probe. It commits all N
transactions while an external transaction holds `FOR SHARE` on the
channel row. It also asserts that no
`buzz_db_channel_ttl_refresh_failures_total` is counted.
- **Mutation check:** with `SELECT … FOR UPDATE` injected into
`refresh_channel_ttl`, the new test fails (`must not wait on the channel
row`, timeout at 10s). The old test passes under the same mutation.
  - **Blox:** fmt and `buzz-db` clippy pass.

- **GitHub CI at `4f7d0baf0`:** every required check passes (56 pass, 0
fail). CI builds the merge ref with `main` `93ffc37cb`.
- **New and renamed tests, checked by name in the CI logs at
`4f7d0baf0`.** These pass in PostgreSQL Domain / PostgreSQL Tests
([117033725006](https://github.com/block/buzz/actions/runs/38915998692/job/117033725006)):
  - `permanent_channel_event_commits_do_not_lock_the_channel_row`
-
`migration_schema_ttl_retirement_drops_every_partition_trigger_and_keeps_checksums`
-
`migration_schema_push_retirement_preserves_ttl_and_published_checksums`
-
`event_insert_ttl_refresh_handles_permanent_ephemeral_duplicate_and_activation_race`
- `{desired,migration_schema}_event_follow_up_contract_{dual,app_only}`
(four tests)

`embedded_migrator_contains_consolidated_initial_schema` passes in Rust
/ Unit Tests
([117024125423](https://github.com/block/buzz/actions/runs/38915998692/job/117024125423)).
No `*_push_retired` test runs anywhere.
- **Blox gates at `678927730`** (private PG16 + Redis, on a workstation
shared with other sessions):
- `cargo fmt --check`, workspace `clippy -D warnings` and `buzz-db
--lib` all pass.
- The `buzz-admin`, `buzz-audit`, `buzz-deletion`, `buzz-push-gateway`,
`buzz-search` and `buzz-workflow` Postgres packages pass.
- `buzz-db`: 517 of 519 tests passed. The 2 that hung, both
`writer_pool_*` tests, were killed. `buzz-relay`: 413 of 426 passed. The
13 failures are covered below.
- **Uncontended reruns at `4f7d0baf0`** on a fresh, idle workstation
(PG16.15, `competing=0` for every arm):
- **`writer_pool_rejects_non_read_committed_database_default` predates
this PR.** It timed out 3/3 at head and 3/3 at `main` `93ffc37cb`, with
a 300s timeout per run.
- **`writer_pool_metrics_stop_after_session_timeout_setup_failure` also
predates this PR.** It timed out 2/3 at head and 2/3 at `main`, and
passed in the remaining run on each side.
- Both tests pass in CI. The gate accepts them as a named exception for
this PR, as a pre-existing hang on the PG16 test environment.
- **`buzz-db`:** 518 of 519 tests passed. The single failure is
`writer_pool_rejects_non_read_committed_database_default`, killed after
it hung (the exception above).
- **`buzz-relay`: still open.** 413 of 426 tests passed. The same 13
`handlers::group_state_postgres_tests` failed as on the shared box, each
panicking at once in its fixture's `ensure community` step with
`Sqlx(PoolTimedOut)`. Contention does not explain them. The fixture's
community setup is in `buzz-db`, which this PR changes. A head/`main`
comparison of the full `buzz-relay` package on the same idle box is
running to find out whether this predates the PR. All 13 pass in CI at
this head.
- **E2E (Gimli, Blox)** at `050e593af`. `050e593af..678927730` changes
only tests and docs; the migration, schema and runtime code are
byte-identical. Gimli's audited verdict: **EXERCISED AND WORKS**, for DB
and relay runtime only. Gimli ran it at `050e593af`; this head's runtime
is byte-identical but was not freshly executed.
- **Upgrade:** a real relay startup took the schema from 0064 to 0065.
That removed the TTL function and the trigger from the parent table and
from all 8 partitions. Checksums for migrations 1–64 are unchanged.
- **Lock-timeout rollback:** with a real lock held, the migration failed
with `55P03` at 5.0007s and the schema rolled back fully to 64. Once the
lock was released, a retry applied 65.
- **Fresh desired schema:** after pgschema plus reconcile, the retired
objects are absent.
- **Real signed kind-9 sends:** on both schema paths, these refreshed
ephemeral-channel deadlines to about +600s. Permanent channels stayed
NULL.
- **Raw SQL insert:** at 64 it refreshed the deadline. After 65 it left
the deadline unchanged, on both the upgraded and the fresh schema.
  - **Not covered:** native or device testing, and deploy.
- **Review:** Legolas found 0 P0 and 0 P1. His three optional P2s are
fixed in `678927730`.
- **No human app test:** this is a DB-only change.
- **Migration numbering:** #8237 and #8372 also add a `0065_*`
migration. Whichever PR merges second must renumber.

---------

Signed-off-by: Elrond <28d6302a099e5225b02c4155ac4236e4912603df2ab08dbfc2f4fef08ce598c8@buzz.block.builderlab.xyz>
Co-authored-by: Elrond <28d6302a099e5225b02c4155ac4236e4912603df2ab08dbfc2f4fef08ce598c8@buzz.block.builderlab.xyz>
2026-10-16 11:22:21 -04:00
Tom Brow
6766174673 chore(push): retire push notification database trigger (#8352)
Buzz must schedule mobile push notifications when it saves an eligible
message. The relay, the server that receives and stores messages, now
does this in application code. An older database trigger still exists.
This trigger is a rule that runs automatically when a message is saved.

This PR removes the old trigger and its supporting database function.
The relay remains responsible for scheduling notifications. Migration
0063 makes this change in existing databases; updated setup scripts
apply it to new databases.

The change does not turn on push notifications. Production migration and
deployment need separate approval. Before deployment, verify the release
images and all pending database migrations. If push needs to be stopped
after release, disable it with the feature flag and keep the qualified
application version and database schema. Do not downgrade the
application image.

### Validation

- Local checks passed: 519 isolated database integration tests, 166
database unit tests, 17 source-policy tests, and the relay push-runtime
tests.
- Tests verify that the migration removes the old trigger, preserves
earlier migration records, and lets the application schedule push work
correctly. A concurrency test exercises the real application path;
deliberately removing its lock makes the test fail.
- [Current-head CI passed on
retry](https://github.com/block/buzz/actions/runs/38752849383/attempts/2).
The first attempt had one database-connection timeout during test setup;
the failed jobs passed when rerun on the unchanged commit.
- Initial local CI and push checks hit unrelated ACP test failures,
which passed when run separately. Only the Rust-test push hook was
skipped under the repository's local-check exception; other applicable
hooks passed.

### Before merge

- [x] Migration 0063 is available and the push trigger remains on [main
at
5397ea4](5397ea49e2).
Recheck if main advances before merge.

---------

Signed-off-by: Tom Brow <tomb@block.xyz>
2026-10-15 08:37:55 -07:00
Luke Tornquist
745501962e refactor(schema): fan desired-state schema out to one file per table (#8131) 2026-10-08 08:47:44 -04:00