## Summary
`docs/trigger-retirement-deployment.md` (added in #8326) named "the
first relay release that contains #8325" as the required stop before
migrations 0089–0091. Relay deployments run images built from main, and
no tagged relay release contains #8325. So the doc now names any relay
build at or after `68785206` (the merge of #8325) as the stop. It also
tells deployments on a tagged release, such as `relay-v0.3.0`, to move
to a stop build first.
This is the follow-up promised in the #8326 review thread.
## Changes
- `docs/trigger-retirement-deployment.md`: "stop release" becomes "stop
build" throughout. The required-stop section names the commit.
The `0089_retire_created_at_floor.sql` comment still says "release".
That migration has merged, and editing it would change its sqlx
checksum, so it stays as is.
## What got simpler
The procedure no longer depends on a release being cut. Operators follow
the image they already deploy.
## Testing
Docs-only. No code or migration changes.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Signed-off-by: Luke Tornquist <tornquist@squareup.com>
Co-authored-by: Elrond <28d6302a099e5225b02c4155ac4236e4912603df2ab08dbfc2f4fef08ce598c8@buzz.block.builderlab.xyz>
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>